We rented a trencher and a mini-excavator for the weekend on Friday (1 day rate for 2.5 days use). I worked on water and power over the weekend with help from my Dad and brother. 460' of water line is in the ground waiting to be covered. 400' of conduit for the underground power line is ran to where a transformer will be set. It rained about half of both days, and made for some muddy, muggy work. We have also been working on grading a bed for the driveway by removing the topsoil.
Sunday, August 2, 2009